G3 Quality
  • About
    • Meet Our Team
    • The G3 Way
    • Careers
  • Services
    • Quality Management
    • Pavement Engineering and Materials Design
    • Construction Inspection and Testing
  • Projects
  • Articles
  • Contact
  • Contact us
G3 Quality
Construction Inspection

Changes Are Here Part 3 – Caltrans 2018 Revised Standard Specifications (RSS)

May 21, 2020 by G3 Quality

On April 17, 2020, the State of California Department of Transportation released their revised standard specifications (RSS) to the 2018 Standard Specifications. In this blog, we will talk about an addition to Section 40 that requires Quality Assurance (Q/A) to increase the acceptance sampling from 2 beams to 3 beams. … Read More

Materials Testing & Inspection

Changes are Here Part 2 – Caltrans 2018 Revised Standard Specifications (RSS)

May 14, 2020 by G3 Quality

On April 17, 2020, the State of California Department of Transportation released their revised standard specifications (RSS) to the 2018 Standard Specifications. In this blog, we will talk about additions to Section 40 that now require an earlier age testing in the laboratory mix design study and compressive cylinders to … Read More

Construction Inspection

Changes Are Here – CalTrans 2018 Revised Standard Specifications (RSS)

May 7, 2020 by G3 Quality

AUTHOR: Marc Robert Technical Services Director G3 Quality, Inc. On April 17, 2020, the State of California Department of Transportation released their revised standard specifications (RSS) to the 2018 Standard Specifications. In this blog, we will talk about additions to Section 40 that will broaden the abilities of a contractor … Read More

Categories

  • #THEG3WAY
  • California drought
  • Construction Inspection
  • Industry News
  • Infrastructure Projects
  • Materials Design
  • Materials Testing & Inspection
  • Pavement & Materials Design
  • Project Management
  • Quality Management
  • Safety

Sign Up to Receive Our Newsletter

#TheG3Way

info@g3quality.com

 

Office - 562.321.9840
Fax - 562.321.9850

 

13850 Cerritos Corporate Drive, Suite E
Cerritos, CA 90703

© 2023 G3 Quality | Built and maintained by KWSM: a digital marketing agency

  • About
    • Meet Our Team
    • The G3 Way
    • Careers
  • Services
    • Quality Management
    • Pavement Engineering and Materials Design
    • Construction Inspection and Testing
  • Projects
  • Articles
  • Contact